Slab is Shifting



The above pictures of the slab at the old bridge location on Plum Creek close to the existing Plum Tree Lane overpass were made in July 2021.
Below are pictures I made on 18 December, 2021. The slab is slipping down towards the water. There is a big crack in the bank behind the concrete. If it slides into the water it is going to alter the flow of Plum Creek.


