Slab is Shifting

The above pictures of the slab at the old bridge location on Plum Creek close to the existing Plum Tree Lane overpass were made in July 2021.

Below are pictures I made on 18 December, 2021.  The slab is slipping down towards the water.  There is a big crack in the bank behind the concrete.  If it slides into the water it is going to alter the flow of Plum Creek.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s